When to Fuse, When not to Fuse for Solar System?
For the current string power inverters, different manufacturers have different technical routes. Single-phase inverters of below 6 kW and three-phase inverters of below 10 kW generally use two MPPT loops. Each MPPT loop is equipped with one string. For the small industrial and commercial projects, power inverters of 20kW to 40kW are usually used. The number of MPPTs ranges from 2 to 4, and each MPPT loop is equipped with 2 to 4 strings. As to the large-scale power stations, high-power string inverters of 60kW to 80kW are generally selected. The number of MPPTs ranges from 1 to 6, and each MPPT loop is matched with 2 to 12 strings.
PV Off-Grid Solar System Troubleshooting
The photovoltaic off-grid power generation system is mainly used to solve the basic electricity consumption problem for residents in areas without electricity or insufficient electricity. The photovoltaic off-grid power generation system is mainly constituted by the photovoltaic component, bracket, controller, power inverter, storage battery and power distribution system. Compared with the photovoltaic grid-connected system, the off-grid system has an additional controller and storage battery. In addition, the inverter directly drives the load, so the electrical system is more complicated. Since the off-grid system may be the only power source of the user and the user relies more on the system, the off-grid solar system design and operation must be more reliable.